Explore the Possibilities. Together.

Guides & how-toWaterPave

Preparing a site for WaterPave permeable concrete

A WaterPave surface works with the ground beneath it. Here’s what decides the build-up, how drainage and planning rules fit in, what to gather for a quote, and how it compares with other surfaces.

RMRyan McGovernLead chemist & formulator, Infinity Effects26 Nov 2026 · 4 min read
WaterPave · Permeable

Ground, loads and drainage: getting a site ready.

A WaterPave surface works with the ground beneath it. Here’s what decides the build-up, what to gather before you ask for a quote, and how drainage and planning rules fit in.

  • 35%+voids in the free-draining sub-base
  • 4load specs, from 100 to 300 mm
  • 1 litreof water for every mm of rain on a m²
  • Per sitefinal depths confirmed for each project
What decides the build-up

Three things shape every site.

The site inspection looks at each of these before the proposal is written.

1

How fast the ground drains

The design is matched to how quickly your soil drains, so the water has somewhere to go.

2

What it has to carry

Foot traffic, cars, commercial vehicles, or heavy rigid and emergency vehicles.

3

The drainage design

Final depths depend on the ground conditions, the loads and the drainage design.

Garden paths, public footpaths and landscaped areas that only take foot traffic.

Drainage and planning

Where the water goes, and the rules.

A plain-English summary, not planning advice.

Every millimetre of rain on a square metre is one litre of water. A 60 m² driveway in a 1,000 mm year takes 60,000 litres, and a sealed surface sends all of it to the drains.

WaterPave lets it soak away where it falls: less standing water, fewer puddles and less load on the drains.

Quote checklist

Gather these before you ask for a quote.

0/7

Gather your project details

The site inspection confirms the rest.

Get a WaterPave quote
Compare surfaces

Which surface suits the job?

Four common ways to surface a drive or car park.

Lets rain through: yes, through the whole surface.

Finish: seamless, open-textured concrete in oxide colours.

Made from: stone locked together with cement and WaterPave admixtures.

Vehicle loads: four specs, up to heavy rigid and emergency vehicles.

FAQ

Questions we get asked

Does every site need a survey?

Yes. The site is inspected and you receive a proposal with the build-up for your ground and loads.

What’s under the surface?

A free-draining sub-base of compacted stone screenings, with at least 35% voids, over the natural ground.

Can WaterPave count towards SuDS?

Permeable surfaces can form part of a Sustainable Drainage System. Requirements vary by location and project, so check with your local authority or designer.

Do I need planning permission for a permeable driveway?

Front-garden paving rules favour surfaces that let water through, but they differ by nation, with extra limits for listed buildings, conservation areas and some newer estates. Check the official guidance for where you are.

Downloads & tools
Having it done?Find an Infinity-trained installer near youFind an installerInstalling it yourself?Learn the system at an Infinity Effects certified schoolSee the training

Keep reading

All news & guides

Leave a Comment

Your email address will not be published. Required fields are marked *

Shopping Basket