How to install an R.S.P decorative pour, step by step
A decorative pour is built in four layers: primer, poured colours, clear topcoat and an optional sheen coat. Here’s each system, every step from prep to cure, the clock you’re working against and how much you’ll need.
Prime, pour, protect: a seamless pour, step by step.
R.S.P Polyaspartic is a UV-stable, 100% solids system you can pour, roll or spray. A decorative pour is built in four layers, with a P.HB Screed base first on floors that can’t be ground.
- 3systems: one countertop, two floors
- ≈ 1.4 m²per kg of poured base coat
- 2 h · 20 mingel time, Slow Set · Fast Set
- 48 h · 6–8 hback in use, Slow Set · Fast Set

Three systems, one seamless pour.
Worktops and ground concrete floors take the four-layer pour. Floors you can’t grind get a P.HB Screed base first. Tap a layer for the product, coverage and timings.
Mandatory in every R.S.P system. Mixed 3:1 (all of Part B into Part A, 60–90 seconds with a low-speed drill and paddle) and rolled or brushed over the whole surface. The pour goes on while it’s still tacky.
- Coverage
- About 2.5 m² per kg on decorative pours
- Overcoat
- From 15 minutes (tacky), within 4 hours
- Colours
- White, Mid Grey, Black
A UV-stable, 100% solids polyaspartic, mixed 1:1 (all of Part B into Part A, 2–3 minutes with a slow-speed drill and flat paddle). Tinted and poured in one, two or more colours, levelled with a notched squeegee and worked into the design with a roller.
- Coverage
- About 1.4 m² per kg poured
- Gel time
- Slow Set 2 hours · Fast Set 20 minutes
- Recoat
- From 20 minutes, within 12 hours
- Colours
- Clear, White, Black, 130+ POLY colours or RAL
A crystal-clear, high-gloss polyaspartic, mixed 1:1 and poured as a flood coat, spread with a notched squeegee and roller. It protects the design and deepens it.
- Coverage
- About 1.4 m² per kg poured
- Ready for use
- Slow Set 48 hours · Fast Set 6–8 hours
A water-based sheen coat for a different finish and extra protection. Up to 10% DI water where needed; rolled or brushed evenly.
- Coverage
- About 15 m² per kg
Spread over concrete ground to a CSP 2–3 profile by squeegee, roller or brush, with complete, even coverage. A porous floor takes a second coat.
- Coverage
- About 2.5 m² per kg per coat
- Overcoat
- From 15 minutes (tacky), within 4 hours
A UV-stable, 100% solids polyaspartic, mixed 1:1 (all of Part B into Part A, 2–3 minutes with a slow-speed drill and flat paddle). Tinted and poured in one, two or more colours, levelled with a notched squeegee and worked into the design with a roller.
- Coverage
- About 1.4 m² per kg poured
- Gel time
- Slow Set 2 hours · Fast Set 20 minutes
- Recoat
- From 20 minutes, within 12 hours
- Colours
- Clear, White, Black, 130+ POLY colours or RAL
A crystal-clear, high-gloss polyaspartic, mixed 1:1 and poured as a flood coat, spread with a notched squeegee and roller. It protects the design and deepens it.
- Coverage
- About 1.4 m² per kg poured
- Ready for use
- Slow Set 48 hours · Fast Set 6–8 hours
A water-based sheen coat for a different finish and extra protection. Up to 10% DI water where needed; rolled or brushed evenly.
- Coverage
- About 15 m² per kg
The first coat, under the screed.
- Coverage
- About 7.5 m² per kg
Self-adhesive 60 g/m² reinforcement mesh in 1 m wide rolls.
- Overlaps
- Allow about 10%
A polyaspartic hybrid screed, mixed 4:1:1 and laid at 3 mm, for floors that are uneven or can’t be ground.
- Coverage
- About 3 m² per 15 kg kit
A second primer coat over the screed, ready for the pour while tacky.
A UV-stable, 100% solids polyaspartic, mixed 1:1 (all of Part B into Part A, 2–3 minutes with a slow-speed drill and flat paddle). Tinted and poured in one, two or more colours, levelled with a notched squeegee and worked into the design with a roller.
- Coverage
- About 1.4 m² per kg poured
- Gel time
- Slow Set 2 hours · Fast Set 20 minutes
- Recoat
- From 20 minutes, within 12 hours
- Colours
- Clear, White, Black, 130+ POLY colours or RAL
A crystal-clear, high-gloss polyaspartic, mixed 1:1 and poured as a flood coat, spread with a notched squeegee and roller. It protects the design and deepens it.
- Coverage
- About 1.4 m² per kg poured
- Ready for use
- Slow Set 48 hours · Fast Set 6–8 hours
A water-based sheen coat for a different finish and extra protection. Up to 10% DI water where needed; rolled or brushed evenly.
- Coverage
- About 15 m² per kg
The pour, one step at a time.
These steps follow our countertop and floor application guides. With Fast Set there’s no time to go looking for a spreader, so set everything up first.
- 1
Clear the area and plan the pour
Take out appliances and fittings so you have full access to the whole area. Plan the design, and lay out every colour, tool and your mixing station before you mix anything.
TipWork in a clean, dry area free from airborne dust, with good ventilation. Wear gloves, eye protection and a respirator.
- Gloves
- Eye protection
- Respirator
- 2
Prepare the surface
Worktops: abrade the whole top with 220–400 grit to remove the gloss and give an even key, vacuum, tack-cloth, then degrease with Fusion Degreaser, acetone or denatured alcohol and let it dry. Floors: mechanically prepare the concrete to a CSP 2–3 profile, with no smooth areas left at the edges, and vacuum thoroughly. Floors you can’t grind get a P.HB Screed base first.
TipOur prep and troubleshooting guide covers cracks, joints and porous surfaces.
- 220–400 grit abrasive
- Vacuum
- Tack cloths
- Fusion Degreaser
- 3
Mask and protect
Mask everything nearby with painter’s tape and protective sheeting before any resin is mixed: cabinets, walls, splashbacks and flooring.
- Painter’s tape
- Protective sheeting
- 4
Prime
15 min to 4 hMix R.S.P Primer 3:1 for 60–90 seconds with a low-speed drill and paddle. Roll or brush it over the whole surface without missing any areas. It’s ready for the pour once it’s tacky, from about 15 minutes. A porous surface takes a second coat first.
TipDon’t let the primer cure fully. Pour the base coat while it’s still tacky, inside its 4-hour overcoat window.
- Low-speed drill and paddle
- Roller or brush
- 5
Mix the pour colours
Mix each colour of R.S.P Poly Base Coat 1:1: pour all of Part B into Part A and mix for 2–3 minutes with a slow-speed drill and flat paddle. Add mica powder for metallic effects; Build Your Pour allows 50 g per kg of base coat. If you need more working time, add up to 5% Poly Extender, and no more than that.
TipMix only what you can pour. Mixed resin warms itself as it reacts, and a full bucket gels fastest.
- Slow-speed drill and flat paddle
- Mixing buckets
- Mica powders
- 6
Pour and create the design
gel: 2 h · 20 minPour across the tacky primer and level it with a notched squeegee. Then use a roller and your decorative technique to move the colours and build the design, keeping control at the edges, transitions and detailed areas.
TipPouring, spreading, blending, pulling veins and popping bubbles all have to be done before the gel time: 2 hours for Slow Set, 20 minutes for Fast Set at 15 °C. Warmth shortens both.
- Notched squeegee
- Non-shed levelling roller
- 7
Pour the clear topcoat
20 min to 12 hOnce the base coat is ready to recoat (from 20 minutes, within 12 hours), mix R.S.P Poly Topcoat 1:1 and pour it evenly, spreading with a notched squeegee and roller.
TipUp to 5% Poly Extender can go in the topcoat too, only if you need it.
- Notched squeegee
- Levelling roller
- 8
Add a sheen coat (optional)
For satin or matt, roll or brush R.S Urethane Topcoat over the clean resin, adding up to 10% DI water where needed. Check under good light for even coverage and an even sheen.
- Roller or brush
- 9
Protect it while it cures
48 h · 6–8 hKeep it free from handling, cleaning, water, chemicals, heavy use and appliances until it has cured: 48 hours before use for Slow Set, traffic after 6–8 hours for Fast Set (recommended). Then inspect it under good light, edges included.
TipCold slows the cure, so allow longer in a cold room.


Gel, recoat, use: the clock that runs the job.
Drag the slider from the moment each product is mixed or applied.
- 15 minTacky: ready for the pour
- 4 hoursOvercoat window closes
- 20 minEarliest recoat
- 2 hoursGel time: stop working the resin
- 12 hoursRecoat window closes
- 24 hoursFull dry
- 48 hoursReady for use (recommended)
- 20 minGel time at 15 °C, and earliest recoat
- 2 hoursDry
- 6–8 hoursReady for traffic (recommended)
- 12 hoursRecoat window closes
Times from the R.S.P product data. Fast Set’s gel time is measured at 15 °C: warmth shortens it, and cold slows the cure. Your working time is always shorter than the gel time, because the resin thickens on the way there.
How much you’ll need.
A quick estimate from our coverage figures. Build Your Pour splits the base coat by colour and gives your exact kit list and prices.
Use the builder for your exact kit list. Build your pour
R.S.P pours on real jobs.
Marbled worktops and seamless floors, poured by our fitters.
More in the R.S.P Polyaspartic guide series
Questions we get asked
Do I have to use R.S.P Primer?
Yes. R.S.P Primer is mandatory in every R.S.P system. Pour the base coat while the primer is still tacky, from about 15 minutes and within 4 hours.
Slow Set or Fast Set?
Same price, same finish; the difference is the clock. Slow Set has a 2-hour gel time for pours with design work. Fast Set gels in 20 minutes at 15 °C, for small, quick jobs that need to be back in use within hours.
How much resin does a pour need?
The poured base coat and the poured topcoat each cover about 1.4 m² per kg. Every colour needs at least one full kit, so Build Your Pour works out the kits for each colour.
Can I add metallic effects?
Yes, with mica powders mixed into the base coat. Build Your Pour allows 50 g of mica per kg of base coat.
Can I pour over an uneven floor or tiles?
Floor System 1 lays a P.HB Screed base first, at 3 mm over AdhesiMesh Lite, to level and strengthen the floor before the pour.
What colours can I pour?
Clear, White, Black, 130+ POLY colours, or any RAL colour, free on 5 kg kits and tinted on our in-house tinting machine.
Keep reading
All news & guides
One factory, every surface: which Infinity system?Which Infinity system for your project? Pick the surface, from worktops and kitchen doors to floors, walls, driveways, uPVC and furniture, and see the system.26 Nov 2026 · 4 min readRead the guide
Start a coatings business with InfinityHow to start a coatings business with Infinity Effects: pick your services, train and certify, open a trade account, get found and grow.26 Nov 2026 · 3 min readRead the guide
How to order from Infinity EffectsHow to order from Infinity Effects: set up your account, build your kit list, check out and choose delivery, with dispatch times and where we ship.26 Nov 2026 · 3 min readRead the guide