How to install Spray Granite: the step-by-step system guide

Spray Granite goes on in four layers: prepare and prime, a colour coat, the granite fleck and a clear topcoat. This guide walks through each system for countertops, floors and walls, with timings and a kit estimate.

RMRyan McGovernLead chemist & formulator, Infinity Effects26 Nov 2026 · 9 min read
Spray Granite · Hybrid

From bare surface to granite in four layers.

Every Spray Granite system goes on the same way: prepare and prime, a colour coat, the Spray Granite V2 fleck, then a clear topcoat. What changes is the product in each layer, set by the surface and the traffic it takes.

  • 8systems for countertops, floors and walls
  • 22granite looks, semi-cast or full cast
  • 2–3sprayed coats for a full cast finish
  • 10–30 °Capplication range for Spray Granite V2
Installer spraying the granite coat across a floor, by GLM Surfaces
GLM Surfaces · Floor, granite coat going onSee the job →
The build-ups

Pick your system, see every layer.

Resin-based systems are for heavy daily use: busy countertops, floors and wetroom walls. Water-based systems are for light to medium use and include our DIY systems. Tap a layer to see the product, coverage and timings.

  1. Mixed 3:1 and rolled on evenly. It stays tacky through its overcoat window, so the base coat bonds chemically as well as mechanically.

    Mix
    3:1 (A:B), 60–90 seconds
    Coverage
    Up to 7.5 m² per kg; porous surfaces take a second coat
    Overcoat
    15 minutes (tacky) to 4 hours
    Colours
    White, Mid Grey or Black
  2. Mixed 1:1 and rolled onto the tacky primer. A second coat adds build. Tint it to a POLY or RAL colour that suits your granite.

    Mix
    1:1, 2–3 minutes
    Coverage
    About 10 m² per kg, rolled
    Recoat
    20 minutes to 12 hours
    Set speed
    Slow Set or Fast Set
  3. Sprayed with an HVLP gun in even, overlapping passes until you have the look. A full cast takes 2–3 coats, each left to dry.

    Coverage
    1 kg about 15 m², 10 kg about 75 m² (fleck coat)
    Full cast
    About 500 g per m²
    Touch dry
    Under 4 hours at 25–27 °C
    Thinning
    Up to 5–10% DI water, if needed
  4. Mixed 1:1 and rolled over the whole granite finish. A second coat is optional. It’s the resin-based topcoat the warranty needs.

    Mix
    1:1, 2–3 minutes
    Coverage
    About 7.5 m² per kg, rolled
    Ready for use
    Slow Set 48 hours; Fast Set traffic after 6–8 hours
  5. A water-based overcoat for a different sheen and extra protection.

    Mix
    4:1 by weight
    Coverage
    About 15 m² per kg per coat
    Recoat
    From 30 minutes once touch dry
Step by step

The install, one step at a time.

These steps follow our resin-based countertop and floor application guides. Water-based and wall systems go in the same order with their own products, noted where they differ.

  1. 1

    Clear, protect and test

    Remove appliances and accessories. Mask walls, cabinets, splashbacks and flooring with painter’s tape and plastic sheeting. Spray a test panel before you start, to set the gun and agree the look.

    • Painter’s tape
    • Plastic sheeting
    • Test panel
  2. 2

    Clean and key the surface

    Worktops: clean and dry the surface, then lightly abrade with 220–400 grit. Vacuum and wipe with a tack cloth.

    Floors: mechanically prepare the concrete to about CSP 2–3, including edges and details, repair cracks and defects, then industrial-vacuum the whole floor.

    TipGuide 2 in this series has the full prep checklist.

    • 220–400 grit
    • Vacuum
    • Tack cloth
    • Grinder (floors)
  3. 3

    Degrease

    5–10 min

    Remove grease, silicone, wax and contamination with Fusion Pre-Primer / Degreaser, acetone or denatured alcohol, then let it dry completely. Fusion flashes off in 2–5 minutes and is ready to coat in 5–10 minutes at 20 °C.

    • Fusion Pre-Primer / Degreaser
    • Clean cloths
  4. 4

    Prime

    15 min – 4 h

    Resin-based: mix R.S.P Primer 3:1 (all of Part B into Part A, 60–90 seconds with a low-speed drill). Roll it on evenly with no missed areas or pooling. Let it go tacky, at least 15 minutes, and lay the base coat within 4 hours.

    Water-based: there’s no separate primer, as R.S Urethane Primer / Base Coat is primer and colour in one. Breathable walls take Infinity Premium Acrylic White Wall Primer.

    • Roller
    • Low-speed drill and paddle
  5. 5

    Lay the colour coat

    20 min – 12 h

    Mix R.S.P Poly Base Coat 1:1 (all of Part B into Part A, 2–3 minutes with a slow-speed drill) and roll it evenly onto the tacky primer. A second coat adds build; recoat from 20 minutes and within 12 hours.

    Water-based: apply R.S Urethane Primer / Base Coat evenly and let it dry completely. Walls: Hydro Paint until the colour is uniform.

    TipThe base colour shows through the fleck, so choose it with your granite. Build Your System matches them for you.

    • Roller
    • Slow-speed drill
  6. 6

    Spray the granite

    Touch dry < 4 h

    Mix Spray Granite V2 thoroughly without over-stirring. Spray in smooth, overlapping passes, working in small sections, until you have the stone effect. For a full cast, spray 2–3 coats, letting each dry, at about 500 g per m² in total.

    TipKeep gun distance, speed and overlap the same everywhere. Our floor guide uses a 1.4–2.0 mm HVLP setup with an 18 CFM+ compressor; our wall guide sprays at 2 bar with a 2.5 mm nozzle.

    • HVLP gun
    • Compressor
    • Test panel
  7. 7

    Let it dry, then refine

    Let the granite dry fully before you topcoat, or it can whiten. It’s touch dry in under 4 hours at 25–27 °C; cooler rooms take longer. For a smoother feel, lightly sand with 220–400 grit without cutting through the effect, then remove all the dust.

    • 220–400 grit
    • Tack cloth
  8. 8

    Topcoat

    20 min – 12 h

    Resin-based: mix R.S.P Poly Topcoat 1:1 and roll it evenly over the whole granite finish. Add a second coat if you need it. For gloss, satin or matt, finish with R.S Urethane Topcoat.

    Water-based: R.S Urethane Topcoat in gloss, satin or matt; a second coat adds protection. Breathable walls: PU Topcoat v2.

    • Roller or brush
  9. 9

    Inspect and protect

    Check for an even look, even sheen and full coverage, edges included. Keep the surface free from traffic, water, dust and other trades until the whole system has cured, then hand it over.

    TipWith Fast Set R.S.P a countertop system can be finished in a day. With Slow Set, allow 2 days including a 24-hour dry.

A staircase masked up and part-way through coating, by Granite Fx Spain
Granite Fx Spain · Stairs, masked and mid-job · September 2026See the job →
A large commercial unit floor before coating, by GLM Surfaces
GLM Surfaces · Commercial floor before coating · November 2026See the job →
Timings

What’s ready, and when.

R.S.P coats come in Slow Set or Fast Set at the same price. Drag the slider to see what you can do as the system cures.

  1. 20 minThe next R.S.P coat can go on (within 12 hours)
  2. 24 hoursFully dry
  3. 48 hoursReady for use (recommended)

Fast Set’s 20-minute gel time is at 15 °C, so take care on medium to large areas. Water-based worktops can be done in a day with catalyst and infrared lamps, but we recommend allowing 2 days.

Kit estimate

How much you’ll need.

A quick estimate from our coverage figures. Build Your System gives your exact kit list, the cheapest mix of kit sizes and your prices.

Use the builder for your exact kit list. Build your Spray Granite system

Real jobs

Spray Granite on real jobs.

Kitchens, floors and a pool deck, sprayed by fitters who know the system.

FAQ

Questions we get asked

Can I install Spray Granite myself?

Yes. Countertop System 2, Floor System 3 and Wall System 1 are DIY systems. Resin-based systems are professional systems, best fitted by a trained installer, and the wear-and-tear warranty on Countertop System 1 needs an installer certified through Infinity Training.

What spray equipment do I need?

An HVLP gun and a compressor. Our floor guide lists a 1.4–2.0 mm setup with an 18 CFM+ compressor, and our wall guide sprays Spray Granite at 2 bar with a 2.5 mm nozzle. Always spray a test panel first.

How many coats of Spray Granite?

A semi-cast fleck is sprayed until you have the look. A full cast takes 2–3 sprayed coats, each left to dry, at about 500 g per m² in total.

How long does a worktop take?

With Fast Set R.S.P resin, a countertop system can be finished within a day. With Slow Set it takes 2 days, including a 24-hour dry. Water-based worktops can be done in a day with catalysts and infrared lamps, but we recommend 2 days.

Can I trowel Spray Granite instead of spraying it?

Yes. With INFINITY THIXX Additive mixed in, Spray Granite V2 can be trowelled. Spraying is the standard method.

What temperature can I apply it in?

Spray Granite V2 goes on between 10 and 30 °C. Avoid high humidity, rain and direct sunlight.

Downloads & tools
Having it done?Find an Infinity-trained installer near youFind an installerInstalling it yourself?Learn the system at an Infinity Effects certified schoolSee the training

Keep reading

All news & guides

Leave a Comment

Your email address will not be published. Required fields are marked *

Shopping Basket