Slow Set or Fast Set: which should you choose?
R.S.P Poly Base Coat, R.S.P Poly Topcoat and P.HB Poly Screed all come in two set speeds at the same price. Here's what the times mean on the job, and how to pick the right one.
The time scale stretches the first few hours so you can see the gel times. Fast Set’s 20-minute gel time is at 15°C; warmer conditions shorten it.
Two speeds, one system.
R.S.P Poly Base Coat, R.S.P Poly Topcoat and P.HB Poly Screed each come in Slow Set and Fast Set. The chemistry, the finish and the price are the same. What changes is the clock: how long you can work the resin, and how soon the surface is back in use.
| Slow Set | Fast Set | |
|---|---|---|
| Gel time | 2 hours | 20 minutes at 15°C, shorter when it’s warmer |
| Dry | Full dry in 24 hours | Dry in 2 hours |
| Back in use | 48 hours recommended before use | Traffic after 6–8 hours recommended |
| Working time | Time to pour, spread, blend and detail | Shorter than the 20-minute gel time |
| Best for | Medium to large areas, design pours, first jobs | Small, quick return-to-service jobs |
| Spray Granite worktop | Countertop System 1 in 2 days, with a 24-hour dry | Countertop System 1 completed within a day |
| Price | Same price | Same price |
Times from the R.S.P Poly Base Coat, R.S.P Poly Topcoat and P.HB Poly Screed product data. Fast Set gel time measured at 15°C. Spray Granite timings from Infinity Effects.
Gel time is a deadline, not a target.
Gel time is the point where mixed resin stops flowing and starts to set. Everything you do with it has to be finished before then: pouring, spreading, back-rolling, blending colours, pulling veins, popping bubbles. In practice your working time is a good deal shorter than the gel time, because the resin thickens on the way there.
The 20-minute Fast Set figure is at 15°C. A warm room, a warm surface or resin stored somewhere warm will all shorten it. Cold slows the cure down.
Mixed resin warms itself as it reacts, and a big mass in a bucket warms fastest. Mix only what you can use, and get it out of the bucket and onto the surface.
Have the surface primed, taped and ready, colours measured and tools laid out before you mix. With Fast Set there’s no time to go looking for a spreader.
R.S.P can be applied down to −10°C without heaters, so you don’t need Fast Set just to beat the cold.
Answer five questions, get a set speed.
This follows the same advice as our builders: Fast Set for small jobs that need to be back in use quickly, Slow Set for everything else.
Slow Set
Fast Set has a 20-minute gel time at 15°C, so your working time is shorter than that. Take care if the job grows to a medium or large area.
When can you use it again?
Set the day and time you finish the last coat, and see when each set speed is dry and ready. Handy for planning around a family kitchen or a shop that needs to reopen.
Recommended times from the product data at normal room conditions. Allow longer in the cold.
Where you’ll see the choice.
Each of these products has a Set Speed option on its product page, at the same price. In our Build Your System pages, one choice sets both your Base Coat and Topcoat, starting on Slow Set. Try it below: pick Fast Set and you’ll see the same warning the builders show.
R.S.P Poly Base CoatPigmentable colour coat. Pour, roll, spray or trowel.Slow Set or Fast Set · same price
R.S.P Poly TopcoatClear, UV-stable protective topcoat.Slow Set or Fast Set · same price
P.HB Poly ScreedPolyaspartic hybrid screed for floors.Slow Set or Fast Set · same priceSet speed for your R.S.P Base Coat and Topcoat
- R.S.P Poly Base Coat5kg kit
- R.S.P Poly Topcoat5kg kit
You’ve mixed set speeds in your kit list. Choose one above to set both again.
Same price either way. You can change the Base Coat or Topcoat on its own in your kit list.
You’ve chosen Fast Set. It has a 20-minute gel time at 15°C, so your working time is shorter than that. Please take care if continuing on medium to large areas.
Questions we get asked
What's the difference between Slow Set and Fast Set?
The set speed. Slow Set has a 2-hour gel time, a full dry in 24 hours and 48 hours recommended before use. Fast Set has a 20-minute gel time at 15°C, dries in 2 hours and is recommended for traffic after 6–8 hours. The finish and performance are the same.
Does Fast Set cost more?
No. Slow Set and Fast Set are the same price on every kit size.
Which products come in both set speeds?
R.S.P Poly Base Coat, R.S.P Poly Topcoat and P.HB Poly Screed. Choose the Set Speed option on the product page, or in the kit list on our Build Your System pages.
Can I use Fast Set on a large floor?
We don't recommend it. Fast Set is for small, quick return-to-service jobs. Its gel time is 20 minutes at 15°C, so your working time is shorter than that, and on medium to large areas there's little time to spread and level before it gels. Use Slow Set for bigger areas.
Can I mix Slow Set and Fast Set in one system?
Yes. One choice in our builders sets both the Base Coat and the Topcoat, but you can change either one on its own in your kit list. The builder will tell you when you've mixed them.
Does temperature change the set time?
Yes. The 20-minute Fast Set gel time is measured at 15°C. Warmer rooms, surfaces and materials shorten it, and cooler conditions lengthen it. R.S.P can still be applied down to −10°C without heaters.
How quickly can a Spray Granite worktop be finished?
With Fast Set resin, Countertop System 1 can be completed within a day. With Slow Set it takes 2 days, including a 24-hour dry.
Keep reading
All news & guides
One factory, every surface: which Infinity system?Which Infinity system for your project? Pick the surface, from worktops and kitchen doors to floors, walls, driveways, uPVC and furniture, and see the system.26 Nov 2026 · 4 min readRead the guide
Start a coatings business with InfinityHow to start a coatings business with Infinity Effects: pick your services, train and certify, open a trade account, get found and grow.26 Nov 2026 · 3 min readRead the guide
How to order from Infinity EffectsHow to order from Infinity Effects: set up your account, build your kit list, check out and choose delivery, with dispatch times and where we ship.26 Nov 2026 · 3 min readRead the guide