Infi-Rox is kiln-dried stone and UV-stable ROX Binder, trowelled to depth over the right base. Here’s each build-up, a driveway install step by step, the cure times and how much you’ll need.

RMRyan McGovernLead chemist & formulator, Infinity Effects26 Nov 2026 · 9 min read
Infi-Rox Binder · Resin

Driveways, patios, floors and walls: every Rox build-up.

Infi-Rox is a resin bound system: kiln-dried stone mixed with UV-stable ROX Binder and trowelled to depth. The base changes with the job, from existing concrete or tarmac to a new permeable SuDS base, an internal stone carpet or a wall.

  • 6build-ups: external, internal and vertical
  • 3.5 m²per stone kit at 18 mm on a driveway
  • 5–30 °Claying range, 10–25 °C ideal
  • 24–48 hto vehicle traffic at 20 °C
Hand-trowelling resin bound stone, by Costa Resin & Construction
Costa Resin & Construction · Trowelling the stoneSee the job →
The build-ups

Six build-ups, layer by layer.

These follow the Build Your Rox System builder and our build-up guides. Tap a layer for the product, rate and details.

  1. Structurally sound and free from contamination, with moisture below 6% and pH below 10. 25 MPa or more is recommended. Never damp or green concrete.

  2. Stirred thoroughly with a mechanical mixer and applied by roller, brush or spray with full coverage, no puddles and a wet edge. Don’t thin it unless the TDS says so.

    Rate
    250–500 g/m², depending on porosity
    Minimum
    Not below 5 °C
  3. Laid into the wet, tacky primer, flat with no folds, trimmed around edges, drains and manholes, then pressed in with a roller or float until fully embedded.

    Overlaps
    50–100 mm
    Rolls
    1 m × 130 m
  4. Completely kiln-dried stone mixed with UV-stable ROX Binder in a forced-action mixer, spread to depth, compacted and trowelled smooth.

    Coverage
    About 3.5 m² per kit at 18 mm
    Kit
    100 kg stone + 7 kg ROX Binder
  5. An optional thin, even finishing coat that enhances the colour and protects the surface, applied to a clean, dry surface in dry weather.

    Rate
    About 375 g/m² (250–500 g/m²)
Step by step

A driveway on concrete, step by step.

These steps follow our concrete build-up guide. The SuDS, stone carpet and vertical build-ups above change the base; the mixing and trowelling stay much the same.

  1. 1

    Check the base

    Concrete must be clean, dry, structurally sound and free from contamination: moisture below 6%, pH below 10, and 25 MPa or more recommended. Check for cracks, spalling, depressions, movement joints and weak or powdery concrete.

    TipNever lay onto damp or green concrete.

    • Moisture meter
  2. 2

    Repair, open up and mask

    Fill cracks with repair mortar and grind high spots. Mechanically abrade or diamond-grind where needed for a clean, open profile, then vacuum. Mask walls, edging, drain covers and doors.

    • Grinder or diamond machine
    • Industrial vacuum
    • Masking tape, sheeting
  3. 3

    Prime

    Stir ROX Concrete Primer thoroughly with a mechanical mixer and apply it by roller, brush or spray: full coverage, no puddles, and a wet edge. Allow 250–500 g/m², depending on how porous the concrete is.

    TipNot below 5 °C, and don’t thin it unless the TDS says so.

    • Roller, brush or sprayer
  4. 4

    Lay the mesh

    While the primer is still wet and tacky, roll out CRM Mesh flat, overlapping joints by 50–100 mm and trimming it around edges, drains and manholes. Press it in with a roller or float until it’s fully embedded.

    • Roller or float
    • Knife
  5. 5

    Mix

    2–3 min

    Use completely kiln-dried stone only: a typical blend is one part 1–3 mm (or 2–4 mm) to three parts 2–6 mm. Put the stone in a 120 L or larger forced-action mixer, add the pre-mixed ROX Binder and mix for 2–3 minutes, until every stone is evenly coated, and no longer.

    TipNever use a cement mixer, and never add water or anything else to the binder. Optional extras: 4–5 kg of binding quartz per 100 kg, anti-slip glass beads, and ROX Catalyst where specified.

    • 120 L+ forced-action mixer
    • Mixing drill and paddle
  6. 6

    Lay and trowel

    Discharge onto the primed, meshed base and spread to depth. Compact and smooth it with resin trowels or steel floats, kept clean with Safe Solvent or ROX Trowel Cleaner. Keep a wet edge, and lightly close the surface without overworking it.

    TipDepth sets coverage: 12 mm for paths and patios (about 5.0 m² per kit), 15 mm for light vehicles (4.0 m²), 18 mm for a domestic driveway (3.5 m²), 21 mm for medium to heavy vehicles (3.0 m²) and 24 mm for heavy traffic (2.6 m²).

    • Resin trowels, steel floats
    • Safe Solvent
    • Aluminium trims, expansion-joint foam
  7. 7

    Protect it while it cures

    6–12 h · 24–48 h

    Keep everyone off it during the initial cure. At 20 °C it takes foot traffic after 6–12 hours, light traffic after 24 hours and vehicles after 24–48 hours, with full chemical cure in 5–7 days.

    TipLow temperatures extend the cure; high temperatures shorten the working time.

    • Barrier tape
  8. 8

    Rejuvenator (optional)

    On a clean, dry surface, in dry weather, stir ROX Rejuvenator / Sealer and apply a thin, even coat of about 375 g/m², with no puddles. Let it dry before foot or vehicle traffic.

    TipOur aftercare guide covers handover and rejuvenating older surfaces.

    • Roller
Primer being rolled over the mesh before the stone goes down, by Costa Resin & Construction
Costa Resin & Construction · Primer and mesh stage · November 2026See the job →
Power-trowelling a resin bound driveway, by Costa Resin & Construction
Costa Resin & Construction · Driveway, power trowel · November 2026See the job →
Timings

When it’s ready for feet and wheels.

Drag the slider from the moment the last section is trowelled.

  1. 6–12 hoursFoot traffic
  2. 24 hoursLight traffic
  3. 24–48 hoursVehicle traffic
  4. 5–7 daysFull chemical cure

Times vary with temperature, humidity and the stone. Low temperatures extend the cure. On a SuDS base, the base binder gives about 25 minutes of working time at 20 °C.

Kit estimate

How much you’ll need.

A quick estimate from the Build Your Rox System figures. The builder covers every base and depth, with prices.

Use the builder for your exact kit list. Build your Rox system

Real jobs

Infi-Rox on real jobs.

Driveways, paths, steps and pool surrounds laid by our installers.

FAQ

Questions we get asked

How deep should a resin bound driveway be?

18 mm for a domestic driveway with standard vehicle traffic, 21 mm for medium to heavy vehicles and 24 mm for heavy commercial traffic. Paths and patios go at 12 mm, and light vehicles with no turning at 15 mm.

Can Infi-Rox go over tarmac?

Yes. Existing tarmac is treated like concrete, with CRM Mesh recommended.

Is it permeable?

The New Permeable Base build-up is fully permeable and SuDS compliant, built from the sub-soil up with a bound base course and two mesh layers.

Can I use a cement mixer?

No. Use a 120 L or larger forced-action resin bound mixer.

Does the stone need to be dry?

Yes, completely kiln-dried. Wet or damp stone causes problems.

How long before I can drive on it?

At 20 °C, vehicles after 24–48 hours, with full chemical cure in 5–7 days. Allow longer in the cold.

Downloads & tools
Having it done?Find an Infinity-trained installer near youFind an installerInstalling it yourself?Learn the system at an Infinity Effects certified schoolSee the training

Keep reading

All news & guides

Leave a Comment

Your email address will not be published. Required fields are marked *

Shopping Basket