How to install Infi-Rox resin bound: every build-up, step by step
Infi-Rox is kiln-dried stone and UV-stable ROX Binder, trowelled to depth over the right base. Here’s each build-up, a driveway install step by step, the cure times and how much you’ll need.
Driveways, patios, floors and walls: every Rox build-up.
Infi-Rox is a resin bound system: kiln-dried stone mixed with UV-stable ROX Binder and trowelled to depth. The base changes with the job, from existing concrete or tarmac to a new permeable SuDS base, an internal stone carpet or a wall.
- 6build-ups: external, internal and vertical
- 3.5 m²per stone kit at 18 mm on a driveway
- 5–30 °Claying range, 10–25 °C ideal
- 24–48 hto vehicle traffic at 20 °C

Six build-ups, layer by layer.
These follow the Build Your Rox System builder and our build-up guides. Tap a layer for the product, rate and details.
Structurally sound and free from contamination, with moisture below 6% and pH below 10. 25 MPa or more is recommended. Never damp or green concrete.
Stirred thoroughly with a mechanical mixer and applied by roller, brush or spray with full coverage, no puddles and a wet edge. Don’t thin it unless the TDS says so.
- Rate
- 250–500 g/m², depending on porosity
- Minimum
- Not below 5 °C
Laid into the wet, tacky primer, flat with no folds, trimmed around edges, drains and manholes, then pressed in with a roller or float until fully embedded.
- Overlaps
- 50–100 mm
- Rolls
- 1 m × 130 m
Completely kiln-dried stone mixed with UV-stable ROX Binder in a forced-action mixer, spread to depth, compacted and trowelled smooth.
- Coverage
- About 3.5 m² per kit at 18 mm
- Kit
- 100 kg stone + 7 kg ROX Binder
An optional thin, even finishing coat that enhances the colour and protects the surface, applied to a clean, dry surface in dry weather.
- Rate
- About 375 g/m² (250–500 g/m²)
Treated like concrete, with mesh recommended.
Stirred thoroughly with a mechanical mixer and applied by roller, brush or spray with full coverage, no puddles and a wet edge. Don’t thin it unless the TDS says so.
- Rate
- 250–500 g/m², depending on porosity
- Minimum
- Not below 5 °C
Laid into the wet, tacky primer, flat with no folds, trimmed around edges, drains and manholes, then pressed in with a roller or float until fully embedded.
- Overlaps
- 50–100 mm
- Rolls
- 1 m × 130 m
Completely kiln-dried stone mixed with UV-stable ROX Binder in a forced-action mixer, spread to depth, compacted and trowelled smooth.
- Coverage
- About 3.5 m² per kit at 18 mm
An optional thin, even finishing coat that enhances the colour and protects the surface, applied to a clean, dry surface in dry weather.
- Rate
- About 375 g/m² (250–500 g/m²)
On a stable, free-draining sub-grade with a permeable geotextile overlapped at least 300 mm. Compacted in 75–100 mm layers and checked for level and falls of 1:60 to 1:80.
- Depth
- 125 mm standard; up to 225 mm where sub-soil permeability is a concern
Clean, angular 5–10 mm stone, raked out, compacted and checked for level and falls.
Laid flat with no folds, and pegged or stapled at edges, joins and changes of direction.
- Overlaps
- 100 mm minimum
Kiln-dried 2–6 mm or 4–12 mm stone with 4% ROX Base Binder, mixed for 2–3 minutes and compacted with a steel float or resin trowel. Over-trowelling reduces permeability.
- Depth
- 30 mm domestic · 35 mm commercial
- Working time
- About 25 minutes at 20 °C
Laid flat over the cured base course.
- Overlaps
- 100 mm minimum
Completely kiln-dried stone mixed with UV-stable ROX Binder in a forced-action mixer, spread to depth, compacted and trowelled smooth.
- Depth
- 18 mm domestic · 20 mm+ commercial
- Coverage
- About 3.5 m² per kit at 18 mm
Moisture below 6% CM and pH below 10. Timber must be rigid with no bounce; existing tiles degreased and mechanically deglazed.
Highly absorbent floors may need more.
- Rate
- 150–250 g/m²
Laid into the wet, tacky primer, flat with no folds, trimmed around edges, drains and manholes, then pressed in with a roller or float until fully embedded.
- Overlaps
- 50–80 mm
- Rolls
- 1 m × 130 m
Kiln-dried stone with interior-grade ROX Binder, mixed for 60–90 seconds in a forced-action mixer and trowelled with light, controlled strokes.
- Depth
- 8, 10 or 12 mm; never below 8 mm
- Coverage
- 7.5 m² per kit at 8 mm · 6.0 at 10 mm · 5.0 at 12 mm
Spread as thinly and evenly as possible with a rubber grout trowel, worked into the pores, then back-rolled with a clean, non-shedding roller.
- Rate
- 0.8–1.0 kg/m², depending on compaction
Dust, grease, moss, algae and loose coatings removed, cracks and holes repaired, smooth surfaces abraded or ground for a key.
A thin, even coat of mixed ROX Vertical Binder, brushed or rolled on.
The 1.75 kg kit is mixed 1:1, Part A to Part B, then with up to 25 kg of stone. When the tack coat is tacky and the mix clumps, press it on firmly and compact it flat with a resin trowel.
Prepared as for the 2-part system.
A thin coat of the single-part, water-based binder.
Stone of 6 mm or smaller is recommended. Coat it evenly, let the tack develop, then press and trowel it firmly. It air-cures, so warmth, dry air and airflow help.
A driveway on concrete, step by step.
These steps follow our concrete build-up guide. The SuDS, stone carpet and vertical build-ups above change the base; the mixing and trowelling stay much the same.
- 1
Check the base
Concrete must be clean, dry, structurally sound and free from contamination: moisture below 6%, pH below 10, and 25 MPa or more recommended. Check for cracks, spalling, depressions, movement joints and weak or powdery concrete.
TipNever lay onto damp or green concrete.
- Moisture meter
- 2
Repair, open up and mask
Fill cracks with repair mortar and grind high spots. Mechanically abrade or diamond-grind where needed for a clean, open profile, then vacuum. Mask walls, edging, drain covers and doors.
- Grinder or diamond machine
- Industrial vacuum
- Masking tape, sheeting
- 3
Prime
Stir ROX Concrete Primer thoroughly with a mechanical mixer and apply it by roller, brush or spray: full coverage, no puddles, and a wet edge. Allow 250–500 g/m², depending on how porous the concrete is.
TipNot below 5 °C, and don’t thin it unless the TDS says so.
- Roller, brush or sprayer
- 4
Lay the mesh
While the primer is still wet and tacky, roll out CRM Mesh flat, overlapping joints by 50–100 mm and trimming it around edges, drains and manholes. Press it in with a roller or float until it’s fully embedded.
- Roller or float
- Knife
- 5
Mix
2–3 minUse completely kiln-dried stone only: a typical blend is one part 1–3 mm (or 2–4 mm) to three parts 2–6 mm. Put the stone in a 120 L or larger forced-action mixer, add the pre-mixed ROX Binder and mix for 2–3 minutes, until every stone is evenly coated, and no longer.
TipNever use a cement mixer, and never add water or anything else to the binder. Optional extras: 4–5 kg of binding quartz per 100 kg, anti-slip glass beads, and ROX Catalyst where specified.
- 120 L+ forced-action mixer
- Mixing drill and paddle
- 6
Lay and trowel
Discharge onto the primed, meshed base and spread to depth. Compact and smooth it with resin trowels or steel floats, kept clean with Safe Solvent or ROX Trowel Cleaner. Keep a wet edge, and lightly close the surface without overworking it.
TipDepth sets coverage: 12 mm for paths and patios (about 5.0 m² per kit), 15 mm for light vehicles (4.0 m²), 18 mm for a domestic driveway (3.5 m²), 21 mm for medium to heavy vehicles (3.0 m²) and 24 mm for heavy traffic (2.6 m²).
- Resin trowels, steel floats
- Safe Solvent
- Aluminium trims, expansion-joint foam
- 7
Protect it while it cures
6–12 h · 24–48 hKeep everyone off it during the initial cure. At 20 °C it takes foot traffic after 6–12 hours, light traffic after 24 hours and vehicles after 24–48 hours, with full chemical cure in 5–7 days.
TipLow temperatures extend the cure; high temperatures shorten the working time.
- Barrier tape
- 8
Rejuvenator (optional)
On a clean, dry surface, in dry weather, stir ROX Rejuvenator / Sealer and apply a thin, even coat of about 375 g/m², with no puddles. Let it dry before foot or vehicle traffic.
TipOur aftercare guide covers handover and rejuvenating older surfaces.
- Roller


When it’s ready for feet and wheels.
Drag the slider from the moment the last section is trowelled.
- 6–12 hoursFoot traffic
- 24 hoursLight traffic
- 24–48 hoursVehicle traffic
- 5–7 daysFull chemical cure
- 6–8 hoursWalkable
- 24 hoursFurniture back
- 72 hoursRugs and coverings
- 5–7 daysFull chemical cure
Times vary with temperature, humidity and the stone. Low temperatures extend the cure. On a SuDS base, the base binder gives about 25 minutes of working time at 20 °C.
How much you’ll need.
A quick estimate from the Build Your Rox System figures. The builder covers every base and depth, with prices.
Use the builder for your exact kit list. Build your Rox system
Infi-Rox on real jobs.
Driveways, paths, steps and pool surrounds laid by our installers.
More in the Infi-Rox Binder guide series
Questions we get asked
How deep should a resin bound driveway be?
18 mm for a domestic driveway with standard vehicle traffic, 21 mm for medium to heavy vehicles and 24 mm for heavy commercial traffic. Paths and patios go at 12 mm, and light vehicles with no turning at 15 mm.
Can Infi-Rox go over tarmac?
Yes. Existing tarmac is treated like concrete, with CRM Mesh recommended.
Is it permeable?
The New Permeable Base build-up is fully permeable and SuDS compliant, built from the sub-soil up with a bound base course and two mesh layers.
Can I use a cement mixer?
No. Use a 120 L or larger forced-action resin bound mixer.
Does the stone need to be dry?
Yes, completely kiln-dried. Wet or damp stone causes problems.
How long before I can drive on it?
At 20 °C, vehicles after 24–48 hours, with full chemical cure in 5–7 days. Allow longer in the cold.
Keep reading
All news & guides
One factory, every surface: which Infinity system?Which Infinity system for your project? Pick the surface, from worktops and kitchen doors to floors, walls, driveways, uPVC and furniture, and see the system.26 Nov 2026 · 4 min readRead the guide
Start a coatings business with InfinityHow to start a coatings business with Infinity Effects: pick your services, train and certify, open a trade account, get found and grow.26 Nov 2026 · 3 min readRead the guide
How to order from Infinity EffectsHow to order from Infinity Effects: set up your account, build your kit list, check out and choose delivery, with dispatch times and where we ship.26 Nov 2026 · 3 min readRead the guide